# Save 6bn $HUAHUA from locked pool

**URL:** https://forum.osmosis.zone/t/save-6bn-huahua-from-locked-pool/238
**Category:** Proposal Discussion
**Tags:** passed
**Created:** [August 21, 2023, 12:18pm UTC](https://forum.osmosis.zone/t/save-6bn-huahua-from-locked-pool/238 "2023-08-21T12:18:15Z")
**Posts on this page:** 1
**Page:** 1

<div class="post-metadata">

### Author: ![zdeadex](https://avatars.discourse-cdn.com/v4/letter/z/85e7bf/32.png) [@zdeadex](https://forum.osmosis.zone/u/zdeadex)
#### Post date: [August 21, 2023, 12:18pm UTC](https://forum.osmosis.zone/t/save-6bn-huahua-from-locked-pool/238/1 "2023-08-21T12:18:15Z")

</div>

Woof there,

Following first proposal: [Commonwealth](https://commonwealth.im/osmosis/discussion/6497-recovering-huahua-wrong-external-incentives) to recover the wrong external incentives that locks 6bn $HUAHUA since long, we are keen to provide the code to be reviewed before being send as gov proposal and included in the next upgrade.

The the code there: [Comparing osmosis-labs:main...arlai-mk:main · osmosis-labs/osmosis · GitHub](https://github.com/osmosis-labs/osmosis/compare/main...arlai-mk:osmosis:main?diff=unified)

If nobody is against that, we will push the proposal on chain and ask the osmosis team to include it in the next upgrade.

Have a woof day
